  1. Securing/Availing a Building Permit 

Service Standards: 9 hours and 5-Minutes to finish the transaction

PLEASE FOLLOW THESE STEPS SERVICE PROVIDER IT WILL TAKE YOU YOU WILL NEED TO PRESENT/ PAY PLEASE APPROACH
Secure application   form

 

Fill up application   form

Issue application form & lists of requirements to be submitted 10 min Duly Accomplished & notarize application form

 

Requirement relative to right over land

a. in case the applicant is the registered owner of the lot

a.1 certified true copy of CTC

a.2 tax declaration

a.3 current real property tax receipt

b. in case the applicant is not the registered owner of the lot

b.1 duly notarized copy of the contract of lease,or

b.2 duly notarized copy of the deed of absolute sale, or

b.3 duly notarized copy of the contract of sale

 

Five Sets of plans & specifications, signed and sealed

3.1 by a duly licensed architect in case of architectural and structural plans

3.2 by a duly licensed sanitary engr. Or master plumber, in case of plumbing or sanitary installation plans

3.2 by a duly licensed electrical engr.,in case of electrical plans

3.3 by a duly licensed prof. mechanical engr. In case of mechanical plans

 

4. Architectural Documents

4.1 Location Plan w/in 2-km radius for commercial,indus trial and institutional com plex, and w/in a half km radius for residential bldg at any convenient scale showing prominent landmarks or major thoroughfares for easy reference

4.2 Site dev’t and/or location plan at scale of 1:200m standard or any convenient scale for large-scale dev’t showing position of bldg. in relation to lot. Existing bldg. w/in and adjoining the lot shall be hatched, and distances between the propo sed and existing bldg. shall be indicated

4.3 floor plans of not less than1:100m

4.4 Elevation (at least 4) at scale of not less than 1:100m

4.5 sections (at least 2)at scale of 1:100m

4.6 Foundation plan at scale of not less than 1:100m

4.7 Floor framing plan at scale of not less than 1:100m

4.8 Roof-framing plan at a scale of not less than 1:100m

4.9 Details of footing/column-any scale

4.10 Details of Structural members-any scale at any scale

Darlo T. Arnedo, Gregorio Napicog

Noel Dilan

Harry Caluducan

Jenny Nunag

Ianley Illustrado

Submit application form & req’ts Received/review filled up application  requirements 8 hrs Darlo T. Arnedo, Gregorio Napicog

Noel Dilan

Harry Caluducan

Jenny Nunag

Ianley Illustrado

Prepare  issue billing slip 1 hr Darlo T. Arnedo, Gregorio Napicog

Noel Dilan

Harry Caluducan

Jenny Nunag

Ianley Illustrado

Pay necessary fees Receive payments and issue O.R. 10 min Emma Rimando, Febilyn Ola,

Helen Calasag,  Judith Tucrang  Nestor Pelobello

Prepare Building Permit 30 min Darlo T. Arnedo
Received Building permit

 

 

 

 

 

 

 

 

 

 

 

Building Permit:

a.        Below 20m2

=2.40P/m2

b.      20m2 to 50m2

=3.40P/m2

c.                 51m2 to 100 m2

=4.80P/M2

 

Issue Building Permit Darlo T. Arnedo
End of transaction